Industries / Industrial
Plants where every kilowatt has a reason.
Cognitive control across processes, on-site generation and flexible loads — with verifiable safety envelopes engineered first.
Capabilities
From a single line to the whole plant.
Process-aware scheduling
Aligns flexible loads with production targets and tariff windows.
Generation orchestration
Coordinates CHP, gensets, batteries and PV against site demand.
Safety envelopes
All actions checked against engineered constraint models.
Multi-site fleet
One platform reasoning across plants and regions.
/ case sketch
420 GWh metals plant — peak load reshaped 19% in eight weeks.
Peak reduction
−19%
Annual savings
$2.4M
Process impact
0
Time to value
8 wks
Deploy